Error message

  • Deprecated function: Creation of dynamic property MergeQuery::$condition is deprecated in MergeQuery->__construct() (line 1357 of /var/www/drupal-unai/includes/database/query.inc).
  • Deprecated function: Creation of dynamic property DatabaseCondition::$stringVersion is deprecated in DatabaseCondition->compile() (line 1887 of /var/www/drupal-unai/includes/database/query.inc).
  • Deprecated function: Creation of dynamic property DatabaseCondition::$stringVersion is deprecated in DatabaseCondition->compile() (line 1887 of /var/www/drupal-unai/includes/database/query.inc).
  • Deprecated function: Creation of dynamic property DatabaseCondition::$stringVersion is deprecated in DatabaseCondition->compile() (line 1887 of /var/www/drupal-unai/includes/database/query.inc).
  • Deprecated function: Creation of dynamic property DatabaseCondition::$stringVersion is deprecated in DatabaseCondition->compile() (line 1887 of /var/www/drupal-unai/includes/database/query.inc).

Public Sculpture

1.jpg

Örebro Water tower Competition

The design strategy here was to focus the design in a sculptural drop-like mast that would contain the Telecommunications materials, while the rest of the watert ower was resolved in simpler manner

2.jpg
3.jpg
Picture8.jpg

IA 8 Nanjing Healthy Industrial Complex Transformation and renewal

Bild48.JPG
Bild6.JPG
Bild5.JPG
Bild4.JPG
Bild3.JPG
Bild2.JPG
Bild63.JPG
Imagem1.jpg

IAI 3 Wuxi Metro entrances for train stations

Imagem2.jpg
Imagem3.jpg
Imagem4.jpg
Imagem5.jpg
Imagem6.jpg
Imagem7.jpg
overview.jpg
Imagem8.jpg
Imagem9.jpg
Imagem10.jpg
Imagem11.jpg
Imagem12.jpg
Imagem13.jpg
Imagem14.jpg
Diapositivo36.JPG
Diapositivo35.JPG
Diapositivo34.JPG
Diapositivo32.JPG
Diapositivo31.JPG
Diapositivo30.JPG
Diapositivo27.JPG
Diapositivo26.JPG
M1-system-map1x.jpg
M1-PeoplesHospital2.jpg
M1-Sanyang-Plaza10.jpg
M1-Sanyang-Plaza5.jpg
M1-Sanyang-Plaza1.jpg
4-9-2008_173.JPG
  • Project Description:  Mediation and community involvement in resolving issues between hawkers and shop owners about street trading on the pavements. This process resulted in the formalized hawker stalls in steel and canvas structures, benches, bollards, sculptures, Public Lighting and landscaping and formalization of hawkers in the Johannesburg CBD.
  • Position: Project Architect
  • Date:1995
  • Client: Johannesburg Metropolitan Council
4-9-2008_172.JPG
4-9-2008_171.JPG
4-9-2008_169.JPG
4-9-2008_165.JPG
6-25-2010_053.JPG
4-9-2008_178.JPG
4-9-2008_174.JPG
4-9-2008_175.JPG
4-9-2008_184.JPG
4-9-2008_185.JPG
4-9-2008_179.JPG
4-9-2008_176.JPG
4-9-2008_180.JPG
4-9-2008_186.JPG
6-25-2010_007sm.jpg
  • Project description: This informal yet historical market occupied council land. This required the formalisation and organization of Herbal Healers and informal traders for the Johannesburg City Council. The outcome was consultation rooms for the witchdoctor’s, and lockable storage for their natural remedies for which they would pay city council a rental.
  • Client: Johannesburg Metropolitan Council
  • Position: Project Architect
Fotografia (230)sm.jpg
Consulting rooms 1.2sm.jpg
Fotografia (229)sm.jpg
consulting rooms 2.4sm.jpg
Consulting rooms 1.1sm.jpg
Fotografia (265)sm.jpg
consulting rooms 2.3sm.jpg
storage units 2sm.jpg
storage units 1sm.jpg
6-25-2010_058sm.jpg
6-25-2010_007sm.jpg
6-25-2010_006sm.jpg
TP 5.jpg
  • Project description: Bloemenhof Park Urban Furniture
  • Client: Johannesburg Metropolitan Council
  • Date: 1997
  • Position: Resident architect/artist invited to collaborate on community project.
  •  Responsibilities: Design, manufacture and installation of public seating, benches and illumination for the Bloemenhof Municipal Park, Troyeville. The furniture was made of steel, concrete and rubber slabs with colourful mosaic to finish.
TP 4.jpg
TP 3.jpg
TP 2.jpg
TP 1.jpg
Municipal workers union.jpg
  • Project Description: Public Sculpture
  • Client :Centenary Celebration sculpture for the Municipal Workers Union        
  • Date: 1997
  • Position: Project manager and Sculptor for a Collaborative work in Concrete reinforced with steel and steel mesh and polypropylene fibre.
6-25-2010_023.JPG
4-6-2008_090.JPG
4-6-2008_097.JPG
4-6-2008_111.JPG
4-6-2008_094.JPG
4-6-2008_143.JPG

Description: An urban renewal project that consolidated four city blocks with the new head offices for the Absa Banking Group, incorporating two existing bank buildings.

Project architects TC Design

Project: Public Seating, benches Bollards, Rubbish Bins and public sculpture.

4-6-2008_135.JPG
4-6-2008_145.JPG
4-6-2008_125.JPG
4-6-2008_134.JPG
4-6-2008_123.JPG
4-6-2008_118.JPG
4-6-2008_149.JPG
3-26-2008_013.JPG
3-26-2008_006.JPG
Fotografia (22).jpg
Subscribe to RSS - Public Sculpture

Contact me