Tourism

1.jpg

Örebro Water tower Competition

The design strategy here was to focus the design in a sculptural drop-like mast that would contain the Telecommunications materials, while the rest of the watert ower was resolved in simpler manner

2.jpg
3.jpg
Guizhou Daiyun 4.jpg

DJ 29 Daiyun Guizhou Mixed Use Development

Project Description: The site is complex due to the split created by the water and the limited access from the highway. In combination with the usual program of commercial, retail, hotel and conference the complexity required different strategies to deal with the problem.

GFA: 642 000

Date: 2013

Responsibilities: I developed a landscape solution to deal with the terrain, by creating platforms, but also using the landscape to integrate the development

Guizhou Daiyun 5.jpg
Guizhou Daiyun 6.jpg
Guizhou Daiyun 1.jpg
Guizhou Daiyun 3.jpg
Guizhou Daiyun 2.jpg
Bild1.jpg

 IA 10 Nanjing Coal Docks reconversion

Bild2.jpg
Bild54.JPG
Bild39.JPG
Bild53.JPG
Bild52.JPG
Bild51.JPG
Bild38.JPG
Bild36.JPG
Bild33.JPG

DJ 28 Wuxi Shopping

Project Description: The aim of the short project was to test the development potential of the site situated near a future metro exit. Urban analysis and market research was more important than the formal resolutions.

GFA: 210 000

Date: 2013

Responsibilities: Design team leader, research and design concepts

 

Bild32.JPG
Bild36.JPG
Bild31.JPG
Bild29.JPG
Bild27.JPG
Bild25.JPG
Niza 1.jpg

Project Description: Niza Resort and Spa.

  • Date: 2004
  • Client: Lnostrum, SA
  • Position: Project Architect
  • Responsibilities: Proposal for an Eco-tourism resort in the mountains for hikers.
Niza 2.jpg
108-0879_IMG.jpg
  •  Project Description: Makalali Game Lodge- Eco tourism Resort
  • Date: 1994-1995
  • Position: Work in collaboration with architect Silvio Rech . Site Architect and nominated subcontractor for steelwork
  • Responsibilities: On site design and construction, where the lodge had to have an African feel and use local materials, skills and Construction methods. All the detailing was evolved on site.
108-0881_IMG.jpg
makalali (5).jpg
ZALVVM008_2.jpg
ZALVVM008_1.jpg
makalali (6).jpg
makalali (7).jpg
makalali (8).jpg
makalali (9).jpg
CON119.jpg
  • Project Description: Ngoro-Ngoro Crater Lodge, Tanzania: Eco-Tourism Resort
  • Date: 1996-1997
  • Client:
  • Position: Site Architect
  • Responsibilities: Work with architect Silvio Rech in the design and construction on site, an International heritage site. Prototype buildings were developed using local materials and labour for client approval.
CON94.jpg
CON126.jpg
CON158.jpg
108-0876_IMG.jpg
4-9-2008_059.JPG
4-6-2008_220.JPG
ECO-TOURISMO CALHETA.jpg
  • Project Description: Calheta hikers lodge.
  • Date: 2005
  • Client: Sousa Gonçalves & Teixeira, Lda
  • Position: Project Architect
  • Responsibilities: Proposal for an Eco-tourism resort in the mountains for hikers.
arco calheta .jpg
  • Project Description: Arco da Calheta Resort.
  • Date: 2005
  • Client: Sousa Gonçalves & Teixeira, Lda
  • Position: Project Architect
  • Responsibilities: Proposal for an Eco-tourism resort on the top of a cliff overlooking the harbour.
PONTA DO PARGO.jpg
  •  Project Description: Ponta do Pargo Resort.
  • Date: 2006
  • Client: Sousa Gonçalves & Teixeira, Lda
  • Position: Project Architect
  • Responsibilities: Proposal for an Eco-tourism resort near a golf Course with excellent sea views.

Pages

Subscribe to RSS - Tourism

Contact me