Retail

Picture27777.jpg

 

Project description:  A factory complex within the city that had already been empty for some years and was to be demolished and the increase the entire areas density with high rise residential buildings set in a residential landscape with some commercial areas to the perimeter.

GFA: 127 500

Date: 2012

Responsibilities: Design Team Leader, responsible for one of the proposals and the project design strategy.

Picture2444.jpg
Picture233.jpg
Picture2666.jpg
Picture2666.jpg
Changzhou masterplan.jpg
基地商业整合36.jpg

AI 5 YangZhong Commercial Facade

A building that was in the Construction process (structure only ) that required a more contemporary façade. I participated in early proposals which evolved dramatically as the client themselves were in a management change.

Date:2011-2012

Position: Team leader, project architect.

Responsibilities: Technical input and initial design proposals. Due to complex client conditions this project was developed by other members.

基地商业整合34.jpg
3.jpg
基地商业整合32.jpg
基地商业整合3.jpg
Bild33.JPG

DJ 28 Wuxi Shopping

Project Description: The aim of the short project was to test the development potential of the site situated near a future metro exit. Urban analysis and market research was more important than the formal resolutions.

GFA: 210 000

Date: 2013

Responsibilities: Design team leader, research and design concepts

 

Bild32.JPG
Bild36.JPG
Bild31.JPG
Bild29.JPG
Bild27.JPG
Bild25.JPG
Picture8.jpg

IA 8 Nanjing Healthy Industrial Complex Transformation and renewal

Bild48.JPG
Bild6.JPG
Bild5.JPG
Bild4.JPG
Bild3.JPG
Bild2.JPG
Bild63.JPG
CEM 2.jpg

Project Description: Madeira Business Centre: Commercial, retail and office building.

  • Date:2004-2006
  • Client: Propower SA
  • Position: Site Architect
  • Responsibilities: My intervention was post Council Approval, producing all the working drawings, site adaptations and cost reductions through to as built drawings.
CEM 1.jpg
MADEIRA RETAIL 1.jpg

Project Description: Madeira Retail Center: This scheme was the first to pioneer the concept of Outlets in the Region.
• Client: Propower, SA
• Date:2006-2007
• Position: Principal Architect
• Responsibilities: This scheme only went as far as council approval, after which got entangled in local politics and development programs

MADEIRA RETAIL 2.jpg
MADEIRA RETAIL 3.jpg
MADEIRA RETAIL 4.jpg
6-25-2010_056sm.jpg
  • Project Description: Low budget design and construction of offices for a recycling company.
  • Date:1995
  • Client: TCE Metals
  • Position: project architect, Project manager and Builder.
  • Responsibilities: I was responsible for the design, the construction and project management.
6-25-2010_026sm.jpg
6-25-2010_030sm.jpg
Imagem4.jpg

 

DJ 48 Wuhu Shopping, Anwhei Province

p1.jpg
p2.jpg
p2.jpg
p3 4.jpg
p4 5.jpg
FIre and program-Model.jpg
elev.jpg
elev 2.jpg
sect.jpg
6.jpg
4.jpg
8.jpg
7.jpg
Comparison (2).jpg
Comparison.jpg
Imagem4.jpg
Imagem5.jpg
Imagem1.jpg
Imagem2.jpg

Pages

Subscribe to RSS - Retail

Contact me