Architecture

1.jpg

Linköping

This project is a large project which required the testing of many different sites with ongoing future development plans.

1.jpg
1 (2).jpg
Alt 3 office in front view to teknik inlast .jpg
Alt 3 office in front birdeye view .jpg
Alt 3 with office on top- view of teknikinlast.jpg
Alt 3 with office on top- birdseye view.jpg
Alt 1 with office IN FRONT- BIRDSEYE.jpg
Alt 1 with office IN FRONT- BIRDSEYE 2.jpg
LOMBA DA CRUZ.jpg
  • Project Description: – Townhouses
  • Date: 2005
  • Client: AldeiasiIlha, SA
  • Position: Project Architect
  • Responsibilities: Master plan for land subdivision, rezoning and infrastructure. This followed by the design and documentation for the approval of 6 houses and individual stands
  • Project Description:  – Townhouses
  • Client: AldeiasiIlha, SA
  • Position: Project Architect
  • Responsibilities: Master plan for land subdivision, rezoning and infrastructure. This followed by the design and documentation for the approval of 36 houses and individual stands
Lorimar (1).JPG
  • Project Description: Lorimer house, Johannesburg: Design and construction of an alteration and addition to an existing house
  • Date: 1995
  • Client: James and Patti Lorimer
  • Position: Architect and Builder

Responsibilities: Production of Council Drawings, Project Management, Construction and the production of steelwork, and mosaic details

Lorimar (5).JPG
Lorimar (3).JPG
Lorimar (7).JPG
Lorimar (6).JPG
Lorimar (4).JPG
Lorimar (2).JPG
Lorimar (15).jpg
Lorimar (12).jpg
Lorimar (11).jpg
Lorimar (13).jpg
Lorimar (10).jpg
Lorimar (9).jpg
APARTMENTS 2.jpg

Project Description: Luanda Apartments, Luanda Angola Luxury apartment concept.

  • Date:2006
  • Client: Propower, SA
  • Position: Project Architect
    Responsibilities: Concept sketch to test market in Luanda.
LUX SCHEME.jpg

Project Description: Luxury houses, Bem Posta, Machico: This project for 4 houses.

  • Date:2007
  • Client: Sousa Gonçalves & Teixeira, Lda
  • Position: Principal /Project Architect
  • Responsibilities: Design and production of drawings and documents for Council approval.
CEM 2.jpg

Project Description: Madeira Business Centre: Commercial, retail and office building.

  • Date:2004-2006
  • Client: Propower SA
  • Position: Site Architect
  • Responsibilities: My intervention was post Council Approval, producing all the working drawings, site adaptations and cost reductions through to as built drawings.
CEM 1.jpg
MADEIRA RETAIL 1.jpg

Project Description: Madeira Retail Center: This scheme was the first to pioneer the concept of Outlets in the Region.
• Client: Propower, SA
• Date:2006-2007
• Position: Principal Architect
• Responsibilities: This scheme only went as far as council approval, after which got entangled in local politics and development programs

MADEIRA RETAIL 2.jpg
MADEIRA RETAIL 3.jpg
MADEIRA RETAIL 4.jpg
108-0879_IMG.jpg
  •  Project Description: Makalali Game Lodge- Eco tourism Resort
  • Date: 1994-1995
  • Position: Work in collaboration with architect Silvio Rech . Site Architect and nominated subcontractor for steelwork
  • Responsibilities: On site design and construction, where the lodge had to have an African feel and use local materials, skills and Construction methods. All the detailing was evolved on site.
108-0881_IMG.jpg
makalali (5).jpg
ZALVVM008_2.jpg
ZALVVM008_1.jpg
makalali (6).jpg
makalali (7).jpg
makalali (8).jpg
makalali (9).jpg
PORTFOLIO MANGUALDE.jpg
  • Project Description:  : An existing warehouse to be transformed into various large Retail stores. The project included full revamp of the existing and all the additional requirements for parking etc. Project as yet unbuilt due to council politics and economic factors.
  • Client:  Electro Viver
  • Date: 2006-2007
  • Position: Project Architect
  • Responsibilities: Design drawings and documentation for council approval.
1_LOTEAMENTOr.jpg
  • Project Description:  Speculative low rise development
  • Date:2005-2006
  • Client: AldeiasiIlha, SA
  • Position: Project Architect
  • Responsibilities: Master plan for land subdivision, rezoning and infrastructure. This followed by the design and documentation for the approval of 3 separate phases: Apartments, Townhouses and a Cluster Development
4-9-2008_092.JPG
  • Project Description: Mendelow house, Johannesburg: Design and construction of an alteration and addition to an existing house in collaboration with Silvio Rech.
  • Date:1998-1999
  • Client: Ronnie Mendelow
  • Position: Architect, in collaboration with Silvio Rech and Builder
  • Responsibilities: I was responsible for all the construction and project management, detailing and art works.
Fotografia (272).jpg
6-25-2010_022.JPG
4-9-2008_099.JPG
4-9-2008_107.JPG
4-10-2008_162.JPG
6-25-2010_034.JPG
4-9-2008_110.JPG
4-9-2008_115.JPG
4-9-2008_118.JPG
6-25-2010_034.JPG
4-10-2008_155.JPG
Fotografia (279).jpg
6-25-2010_011.JPG
bild.jpg

Mölndal Åbybadet

The is a rapidly developing part of the greater Gothenburg region with the potential to attract a lot of population and be a prominent residential district in Gothenburg. The Old swimming pool building was needing renovation or even complete rebuilding.

1.jpg
1 (4).jpg
1 (2).jpg
1 (3).jpg
Municipal workers union.jpg
  • Project Description: Public Sculpture
  • Client :Centenary Celebration sculpture for the Municipal Workers Union        
  • Date: 1997
  • Position: Project manager and Sculptor for a Collaborative work in Concrete reinforced with steel and steel mesh and polypropylene fibre.
6-25-2010_023.JPG
4-6-2008_090.JPG
4-6-2008_097.JPG
4-6-2008_111.JPG
4-6-2008_094.JPG
NA 1.jpg

Immediately after University I began working with a small construction company that designed and built projects. The scope of the works was mainly residential building.

NA 2.jpg
NA 3.jpg
NA 4.jpg
NA 5.jpg
NA 6.jpg
CON119.jpg
  • Project Description: Ngoro-Ngoro Crater Lodge, Tanzania: Eco-Tourism Resort
  • Date: 1996-1997
  • Client:
  • Position: Site Architect
  • Responsibilities: Work with architect Silvio Rech in the design and construction on site, an International heritage site. Prototype buildings were developed using local materials and labour for client approval.
CON94.jpg
CON126.jpg
CON158.jpg
108-0876_IMG.jpg
4-9-2008_059.JPG
4-6-2008_220.JPG
Niza 1.jpg

Project Description: Niza Resort and Spa.

  • Date: 2004
  • Client: Lnostrum, SA
  • Position: Project Architect
  • Responsibilities: Proposal for an Eco-tourism resort in the mountains for hikers.
Niza 2.jpg
3-26-2008_033sm.jpg
  • Project Description:  Public mediation and community participation for the structuring and formalisation for the City Council. This complex process resulted in Steel Structures for the traders and lease agreements for the city council.
  • Position: Project Architect
  • Client: Johannesburg Metropolitan Council
  • Responsibilities: Design and Project Management
4-9-2008_070.JPG
4-9-2008_064.JPG
TENSILE-NET-STRUCTRE.jpg

Nya Ullevi

This stadium was built for Swedish football world cup, which they won. The stadium was repaired in the 80´s but is needing to be transformed to become a more competitive stadium that can host different kinds of events, from the Melodi Festival to the Gothenburg horse jumping events. Our brief was to briefly look at concepts for a way to cover the stadium which was the most important way for the stadium to be better used throughout the year.

TENSILE-NET-STRUCTRE---2.jpg
ARCH-STRUTURE----1-.jpg
ARCH-STRUTURE-WITH-TENSILE-ATTACHEMENT--1-.jpg
GRID-WITH-POLYGON-STRUCTURE---2.jpg
GRID-WITH-POLYGON-STRUCTURE---3.jpg

Pages

Contact me